Construction of a single-lane roundabout is planned in 2027 at the intersection of Hwy 63/Hwy 247 and Olmsted Co. Rd. 12 in Olmsted County. A box culvert will also be replaced east of that intersection on Hwy 247.

This roundabout is being built to improve safety by addressing the existing and growing trend of right-angle crashes at the intersection, which has a high rate of right-angle crashes (72% of the crashes). Recent crash history shows that motorists entering or crossing Hwy 63 have difficulty selecting adequate gaps in the mainline traffic.

A wide variety of low-cost safety enhancements have been implemented at the intersection to improve safety, such as LED-enhanced stop signs, pavement markings and other advance warnings. However, even with these improvements, right-angle crashes at the intersection remain a distinctive crash trend and safety concern.

Benefits of a roundabout

  • Significantly reduces the risk of serious and fatal crashes
    • Roundabouts show an 86% decrease in fatal crashes and an 83% decrease in life-altering injury crashes
  • Allows drivers to get through the intersection more safely and in less time
    • Roundabouts handle high levels of traffic with less delay than most stop signs or signals
  • Slows traffic to make entering and exiting the area easier for all users
    • Entry curves in the approach will slow traffic entering

Navigating a roundabout

Roundabouts may be unfamiliar at first, but with practice, navigating them will get easier with each trip. Learn more about roundabouts.

Traffic impacts

Highways 63 and 247 as well as the intersection where the roundabout is being built will be closed and detoured during construction. Detour routes are on the map. Construction is planned for the spring and summer of 2027. Construction and timeline details are:

  • Construction will begin as early as possible in the spring of 2027.
  • Box culvert replacement work may begin after roundabout construction and should be complete before roundabout completion. Hwy 247 east of the Hwy 63/247 and Olmsted Co. Rd. 12 intersection will remain open before work starts on, and after completion of, the box culvert.
  • MnDOT's goal is to complete work before sweet corn harvest (mid to late July). Actual completion depends on weather and staff availability.

More details will be developed and communicated prior to construction. Please direct specific questions or concerns to the MnDOT Project Manager.